
CCS are supplied folded in polyethylene, airtight, water and rot proof sacks within ISPM15 heat treated timber/ply panel crates.
An electric fan is activated which inflates the plastic inner to lift the structure until it is self supporting. The shelter is then pegged down with ground anchors around the base.
The CCS is then hydrated by spraying with water. Water does not need to be potable but must not be sewage. Sea water may be used.
The Concrete Cloth cures in the shape of the inflated inner and 24 hours later the structure is ready to use. Access holes can be cut to allow the installation of services.